Migrating to ShareVista: A Step-by-Step Checklist
1. Plan & scope
- Inventory: List all files, folders, user accounts, permissions, and integrations to move.
- Objectives: Define success criteria (e.g., zero data loss, downtime < X hours).
- Timeline: Set migration windows and milestones.
- Stakeholders: Identify owners, admins, and support contacts.
2. Clean up source data
- Remove duplicates: Delete or archive redundant files.
- Archive old data: Move infrequently used data to long-term storage.
- Standardize names: Apply consistent naming and folder structure.
- Fix permissions: Resolve inconsistent or orphaned permissions.
3. Prepare ShareVista environment
- Provision accounts: Create user and group accounts with required roles.
- Configure structure: Recreate folder hierarchy, team spaces, and metadata schemas.
- Set policies: Configure retention, sharing, access controls, and encryption settings.
- Integrations: Connect single sign-on (SSO), backup, and third-party apps.
4. Choose migration method
- Manual copy: Best for small sets or selective content.
- Bulk transfer tool: Use ShareVista’s native migration tool or an ETL/third-party mover for large volumes.
- API-based migration: For scripted, repeatable transfers with transformations.
5. Map data & transform
- Mapping sheet: Map source paths, metadata, and permissions to ShareVista targets (use a spreadsheet).
- Metadata translation: Convert or normalize tags, timestamps, and custom fields.
- Permission mapping: Translate source ACLs to ShareVista roles/groups.
6. Test migration
- Pilot run: Migrate a representative subset (2–5% of data).
- Verify integrity: Check file sizes, hashes, timestamps, metadata, and permissions.
- User validation: Have a group of users test access and workflows.
- Adjust plan: Fix issues found and update mappings/scripts.
7. Execute full migration
- Schedule: Run during low-usage window; notify users of expected impact.
- Monitor: Track progress, errors, and performance; retry failures.
- Throttling: Pace transfers to avoid network saturation.
8. Post-migration validation
- Full audit: Verify counts, sizes, hashes, metadata, and permissions against inventory.
- Functionality checks: Confirm integrations, search, sharing, and workflows work.
- User acceptance: Gather feedback and resolve reported issues.
9. Cutover & decommission
- Switch access: Point users to ShareVista and disable writes to the old system.
- Fallback plan: Keep a read-only snapshot for a defined rollback period.
- Decommission: After confirmation, archive or retire legacy systems per policy.
10. Documentation & training
- Update docs: Provide new SOPs, naming conventions, and access guides.
- Train users: Run live or recorded sessions and provide quick-reference cheatsheets.
- Support runbook: Create incident procedures and escalation paths.
11. Optimize & monitor
- Performance tuning: Adjust quotas, caching, and indexing as needed.
- Retention & backup: Confirm backup schedules and retention policies.
- Ongoing review: Periodic audits and cleanup cycles.
Quick checklist (summary)
- Inventory & objectives
- Clean source data
- Prepare ShareVista environment
- Select migration method
- Map data & permissions
- Pilot test
- Migrate fully
- Validate results
- Cutover & decommission legacy
- Document, train, monitor
If you want, I can generate a mapping spreadsheet template or a pilot-test script for ShareVista.